Custom ERP for manufacturing companies

A useful manufacturing ERP tells sales what can actually ship today. A finished and approved item must be distinguishable from work in progress, even when both belong to the same production order.

Follow one production order to dispatch

Consider an order for 100 units. Some are finished, some await inspection and the rest need a substitute material. Define who approves the substitute, which bill-of-materials revision applies and when each unit becomes available to promise.

Design entries around the shop floor

Operators record the start, material consumption, output and reason for any scrap. Warehouse staff need the batch and location, sales needs the next dispatch date and finance needs actual cost. Agree which entries reach accounting and how an invoice can be traced back to the order.

Use an exception as the acceptance test

Release the quality hold, reverse an incorrect completion and ship part of the order. Reconcile physical stock, available quantity and the billable delivery. If the current package passes, price the missing integration before commissioning a replacement.

Frequently asked questions

Do we need machine integration at launch?

Only if delivery or traceability depends on it. An operator-confirmed event can be sufficient. Include duplicate prevention in the acceptance criteria so a completed batch is counted once.