Integrations into the project: risks and how to manage them

TL;DR – Executive summary

Integrations are the biggest risk factor for a software project. Third-party interfaces may change, documentation may be incomplete and error handling is complex. Risk is managed with four things: test integrations at the beginning of the project, prepare for changes, document interfaces and agree on responsibilities in writing. In the ERP system, risk focuses on three interfaces – for storage, billing and e-commerce – And that's why it's worth doing them one at a time, not all at the same time.

Why are integrations risky?

Integration means combining two systems – e.g. website – CRM or e-commerce – warehouse management. Risks arise because:

  • You don't control the other party: The API owner can change it at any time
  • Documentation may be incomplete: Especially in old systems.
  • Mistakes are complex: Which system caused the error?
  • Testing is difficult: Test environments do not match production
  • Performance varies: Slow API slows down your entire application

Typical Integration Problems

Problem Consequence Our solution
API changes without notice Integration ceases to work Monitoring, Versioning
Authentication Fails Connection not working Token Replay, Error Handling
Rate limit exceeded Requests are blocked Jonotus, cachetus
Data format does not match Data is lost or distorted Validation, transformation
The API is slow or down The user expects or receives an error Timeout, fallback, retry

How do you manage integration risks?

1. Find out the integrations at the beginning of the project

List all integrations before starting the project:

  • Which systems need to be connected?
  • Is the API documented?
  • Is the test environment available?
  • Who is responsible for the API?

2. Test integrations early

Do not leave integrations at the end of the project. Test the connection as soon as possible – This way the problems will be revealed in time.

3. Build Error Handling

  • Retry logic: Please try again in a moment
  • Timeout: Don't wait forever
  • Fallback: What happens if integration doesn't work? Save to queue?
  • Logging: Save errors so you can find out why

4. Monitor in production

Track the operation of integrations: successful vs. failed calls, response times, error rates. This is how you will notice the problems before the users.

5. Document and version

  • Document what data is transferred, in which direction and when
  • Use the API versioned endpoint (e.g. /v1/endpoint)
  • Follow the API Change Log

Integration-checklist for the project

  • ☐ All integrations listed and prioritized
  • ☐ API documentation available
  • ☐ Test environment and test symbols
  • ☐ Contact from API provider
  • ☐ Retry and timeout logic designed
  • ☐ Error Handling and Logging Implemented
  • ☐ Monitoring in production
  • ☐ Documented what data is transferred and how

Common errors in integration projects

  1. Suppose the API works according to the documentation: Always test for real.
  2. Not prepared for changes: APIs are changing – Plan an update process.
  3. Not to handle errors: "Happy Path" is not enough – What if the API doesn't respond?
  4. Let's finish: Integration problems are revealed too late.
  5. Not Monitored: Problems are not noticed until the user complains.

ERP is the place where integration risk focuses

Individual integration is a manageable risk. The ERP system is different: it is where all the interfaces hit the same system that the whole company uses on a daily basis. When a warehouse, billing, and online store discuss the same ERP, one broken interface doesn't just break the report – it stops the collection or leaves the bill without leaving.

This year we are building a third custom ERP system for an SME, all with integrated warehouses, billing and online stores. We have found that the risk does not arise from the technical difficulty of a single interface, but from the fact that too many things are introduced on the same day.

This is how I organize ERP integrations to keep the risk under control

  1. The core process first, without integrations. The first production version covers the process that is done most by hand. It works even if no interface is connected yet.
  2. The two most important interfaces included. Usually they are stock and billing, because in them a mistake immediately costs money. These are tested with real data, not sample data.
  3. Parallel drive. The new and old processes run at the same time for a while. If the figures differ, the difference will be visible before it becomes an accounting problem.
  4. Online shopping and the rest of the interfaces only then. I will add them one by one when the previous ones are proven to be stable.
  5. Surveillance and alerts from the start. Each integration logs successes and errors, and a failed move is left in the queue and does not disappear.

This phasing is the reason that ERP deployments do not stretch. In one project, a customer asked for an offer in mid-March, decided to buy in early April and the system was used by the whole company on May 25 – about ten weeks from the call for tenders to production.

Read more about how ERP integrations for warehouse, billing and e-commerce implemented, or how Introduction of ERP in stages progress. The full service description is on the page customized ERP system.

Frequently asked questions

How is the work of integration assessed?

An indicative estimate of the datastorm for a limited, well-documented REST API integration is often around 8-20 hours. The implementation may be smaller or significantly larger than this. An indicative estimate of datastorm for more complex integration (SOAP, OAuth, webhooks, two-way synchronization) is often around 40-100 hours. The implementation may be smaller or significantly larger than this. Poor documentation and a missing test environment increase the workload the most. The delivery content and cost estimate will be agreed before the order.

What if there is no documentation at the interface?

Request documentation or example invitations from the supplier. If they are not available, the interface needs to be explored by experimenting, which increases the workload and risk significantly. In such a situation, we will first make a brief survey and only then provide an assessment of the entire integration.

Webhook or Polling?

Webhook is better: you will be informed as soon as something happens. Polling is an option when webhook is not supported, but it is slower and loads both systems more.

What does integration risk focus on in an ERP system?

In an ERP system, risk focuses on three interfaces: warehouse, invoicing and e-commerce. These three touch money and physical goods, so the error in them is immediately visible to the customer. Other interfaces, such as reporting or internal data transfer, are rarely as critical.

In what order should ERP integrations be implemented?

One at a time and the most important one first. We will take the core process and 1-2 integrations to the first production version, the new and old processes of the time in parallel, and I will add the remaining integrations only when the first ones are proven stable. Thus, one decomposing interface will not bring down the entire deployment.

Who is responsible for integration if the interface changes afterwards?

Agree on this in advance, as the interfaces may change later. Maintenance can be agreed on either as an hourly work or as a continuous contract. The appropriate scope depends on the number of integrations and the frequency of change. Without such an agreement, the repair will be invoiced in the hours agreed upon according to the cost estimate.

Read also

Author

Miko Axel Kallio

Software developer and founder of Datastorm Oy. Build customized ERP systems and their integrations for SMEs.

LinkedIn · Previous content update: 20.10.2026

Planning for integrations – The individual or the whole ERP?

Tell us which systems you need to connect to, and we will estimate the feasibility and workload in hours and euros. We will also tell you directly if the interface is such that it is not worth building – or if the finished connector is enough.

The offer is free and does not bind to anything. We are also happy to do it when you don't yet know if you want to buy: already in the offer you can see what integrations or your own ERP system would cost.

What would you like to improve in your business?

Datastorm Oy's ERP delivery is a written agreement, ready-to-use system from design to commissioning. The initial discussion and the offer are free of charge; any separate specification work will be agreed in advance. Maintenance and subsequent further development will be agreed separately. Explore our ERP service.

Learn about the content of the related service and Tell us about your business need.