Custom ERP for earthworks and construction companies
The hour recorded on the site, the machine used and the work done should be obtained for billing without re-collecting the data. We will go through how projects, sites, resources and documents can be connected to the same ERP system.
The examples in the guide describe the needs of earthwork and other fieldwork. Included Kuokkapekka reference deals with optical fiber construction; not all of the activities described here have been implemented for them. The content of your own ERP delivery is agreed upon according to the needs of the company.
What the public reference of Kuokkapekka really says
Oy Kuokka – Pekka Ab builds the plot sections of the fiber optic network as a turnkey service, from the plot plan to the installation of terminal equipment. It is about field and project work, not a general earth moving company. A public reference says that before the system, the work revolved around paperwork and hand-checking, and that the capacity reaches up to 5000 plots per season, according to the company. The customer relationship has lasted for 8 years: it started with a website and has continued to a customized ERP.
According to the reference, the system includes project management and monitoring, resourcing of employees and equipment, documents, as well as reporting and billing bases. The website is a separate delivery and is made responsive. The reference does not describe a separate mobile application, a working hours stamping module or a project margin report. They should not be read as done. They are the general needs of this guide in earthworks and are delineated by project.
The benefit of the reference that we can say: paper work decreased when projects, resourcing and documents are in the same system. We do not publish any euro-denominated savings or repayments, as it is not in reference.
Project management
A project is a project or plot with a subscriber, address, scope and status of the contract. Status is not a free text field. It is a decision: offered, ordered, running, suspended, handed over, billed. When the mode changes, the next job will appear. The tender phase document must not be mixed with the billing material of the worksite that has been handed over.
In earthworks, one customer can have dozens of items in a season. A list where the item is a line without an address, a machine and a responsible person will not help the supervisor on Monday morning. The management of Kuokkapeka's reference projects is in this category: objects and their tracking in the same place instead of on paper. The structure of your object, whether it be a plot, street section or excavation, will be defined separately.
Sites
The site is the place where the work takes place. It has an address, a map link, a contact person, permissions, and what needs to be ready before the plane leaves. If a permit or map is missing, the departure is in vain. The system may show a deficiency before the resource is allocated. This is a design rule, not a claim that permission control has been built on Kuokkapekka.
Multiple visits to the same site are common. The first visit digs, the second installs, the third checks. Visits are phases of a project, not new projects, unless billing so requires. The completion of a phase is the moment when the billing material or the next resource is released.
Resourcing
The Kuokkapekka system includes resourcing of employees and equipment. It is the same problem in earthworks: the excavator and the driver are different resources, and both can be reserved for different destinations. If only a person is on the calendar, the machine may be on another site. If only the machine is on the list, the driver's holiday is not visible.
The resource shows a week, not just a day. Friday afternoon transfer changes Monday's plan. A good view is the weekly list for the foreman and the items of the day for the foreman. The limit of capacity comes when there are more orders than machines. The public figure of Kuokkapekka, up to 5000 plots per season, explains why the paper division does not scale. It's their capacity, not a promise of your volume.
Hours worked
Hours worked are the basis for invoicing and pay if the contract is not purely fixed-price. The hour must be tied to the project, the phase and the person. Without a project, an hour is an overhead that cannot be allocated. The reference of the Kuokkapeka does not confirm a separate hourly record. If your hours are the basis for salary and additional billing, it will be agreed upon with the delivery.
The entry in the field is short: item, start, end, possible additional work. If the view requires ten fields, it is not used, and the hours come in the evening from memory. Hours can be exported to payroll as a file or interface. Payroll itself is often worth leaving to an off-the-shelf product.
Documents
Kuokkapekka's system includes documents. In earthworks, a document is a plan, permit, photograph of a trench, measurement record or disposal material. It belongs to the project, not as an e-mail attachment. When the site changes, the same folder follows along. Version means: there must be no yesterday's map on the site if the plan changed in the morning.
The image is a document as is the PDF. Before and after pictures reduce the fight over extra work. Taking them must be part of a phase acknowledgement, not a separate task that is left undone.
Invoicing material
The reference talks about reporting and billing templates, not about the fact that the bill would automatically leave financial management. The basis of invoicing means that what can be invoiced can be collected from the project: a completed phase, a contract item or additional work recorded. Financial administration can still form the actual bill.
In earthworks, a payment often follows a phase, not a calendar. If the step is not complete in the system, you should not start compiling the invoice from the email. This rule is worth writing to appear already in the definition. Otherwise, the billing will live at its own pace and the project at its own.
Profitability of the project
Profitability is income minus allocated expenses. The income comes from the contract and additional work. Expenses come from hours, equipment, subcontracts and material, if they have been booked for the project. Without targeting, the report shows the turnover, not the margin. The reference of the Kuokkapeka does not confirm the kate report. If you have a need to see an unfinished cover and not just the final bill, it is designed for its own view and its source data must exist. The report does not correct the missing hourly record.
A useful first report is a list of items where the completed phase has not been billed, or where actual hours exceed the estimate. It is more concrete than a general dashboard.
Mobile use
The foreman and the foreman do not sit in the office. The view must work on the phone: items of the day, document, acknowledgement. Kuokkapekka's website is responsive. The reference for mobile use of ERP does not describe it separately. In a construction project, mobile use is part of the agreed entity if the acknowledgement takes place on the site. It is designed with big buttons and a short form. A weak network at the site means that the acknowledgement must be queued. This should not be assumed to be a by-product from the desktop view. The price guide mentions mobile as its own cost factor for this very reason.
Deployment of the system
We deliver the construction company ERP turnkey with agreed-upon content. Projects, resourcing, documents, hourly records, financial management connections and reports are planned according to your company's needs. Testing, data transfer and commissioning are agreed as part of the whole. We do not use the Kuokkapekka timetable as an example because it has not been published.
A single decision maker and the right targets are required for the test. Old papers don't move by themselves. Open items are exported by hand or as a file, closed items are left in the archive. Maintenance will be agreed on for the system exported to production starting at 1000 €/month + VAT. In a free survey, we will go through what the finished system should contain.
Evaluate project size
Describe the workflow, users, and necessary integrations. You will receive a directional assessment with no contact information.
Frequently asked questions
What has been built for Kuokkapekka?
ERP tailored to the public reference, with project management, resourcing of employees and equipment, documentation, and reporting and billing templates. A website has also been created. The stamping of working hours, a separate mobile application or a markup calculation are not confirmed by the reference.
Is the same model suitable for earthwork?
The chain of the project, site, equipment and documents is the same shape as in the plot work of the optical fiber. Contract payments, permits and machinery are defined by your process. The reference is not a finished earthwork package.
How is the ERP delivery time agreed?
The delivery time of the completed package will be agreed based on the necessary functions, integrations and data transfer. The duration of the introduction of Kuokkapekka has not been published, so it is not used as a schedule promise.
What is the price of an ERP for a construction company?
The price consists of the workload of the agreed functions, integrations, data transfer and commissioning. For example, mobile use, hourly logging and financial administration connections are planned as part of the completed entity. The estimate can be obtained from a price calculator or free mapping.
Read also
Do you want to apply this to your business?
Tell me what your company's system should do. We will go through the need and evaluate the appropriate entity. The initial discussion and the offer are free of charge; any separate specification work will be agreed in advance.
Datastorm's ERP delivery includes agreed planning, implementation and deployment. Maintenance and subsequent further development will be agreed separately. Discover the content of the ERP delivery.